Duration of Storage

3 storage years (1. 4. 2026 - 31. 3. 2029)

Working Gas Volume

500 000 MWh

Injection Output

6 370 MWh/day

Withdrawal Output

8 860 MWh/day

Size of Additional Capacity

300 %

18.10.2024 | (577x)

Storage Capacity Auction 25 October 2024

Auction Date: 25 October 2024, 10:00 a.m. (CEST)

Type of storage capacity reserved: Annual storage capacity with the fixed output

Working Gas Volume: 500,000 MWh

Injection Output: 5,089 MWh/day

Withdrawal Output: 8,376 MWh/day

Storage period: 1-2 storage years (1 April 2025, 6 a.m. - 1 April 2027, 6 a.m.)

 

For additional information please contact: auction@mnd-es.cz
Ing. Josef Brůček Tel.: +420 775 877 182
Filip Červenka Tel.: +420 775 875 092

 

mnd-gs-sample-storage-contract-annual-storage-capacity-bilingual.pdf (355 KB)