Duration of Storage
3 storage years (1. 4. 2026 - 31. 3. 2029)
Working Gas Volume
500 000 MWh
Injection Output
6 370 MWh/day
Withdrawal Output
8 860 MWh/day
Size of Additional Capacity
300 %
25.7.2025 | (473x)
Auction Date: 29 July 2025, 10:00 a.m. (CEST)
Type of storage capacity reserved: Monthly storage capacity with the interruptible output
Working Gas Volume: 55,000 MWh
Interruptible Injection Output (flat): 1,800 MWh/day (31 days)
Interruptible Withdrawal Output (flat): 1,100 MWh/day (62 days according to curve)
Duration of Storage: 8 storage months (1 August 2025, 6 a.m. - 1 April 2026, 6 a.m.)
For additional information please contact: auction@mnd-es.cz
Ing. Josef Brůček Tel.: +420 775 877 182
Filip Červenka Tel.: +420 775 875 092