Storage Period
7 storage months (16.09.2026 -31.03.2027)
Working Gas Volume
278 007 258 kWh
Max. Injection Output
2 949 948 kWh/day
Max. Withdrawal Output
4 112 483 kWh/day
Max. filling time of 90 % of capacity
25.12.2026 (100 days)
An inspection of compliance with the requirements of Act No 224/2015, on the prevention of major accidents, was carried out at Uhřice USF on 13 and 14 September 2022.
This inspection was carried out by the Regional Authority of the South Moravia Region, the Czech Environmental Inspectorate, the Regional Directorate of the Police of the South Moravia Region, the Regional Hygiene Station of the South Moravia Region, the Fire Rescue Service of the South Moravia Region, and the District Mining Authority for the South Moravia and Zlín Regions.
An inspection of the documentation applying to the prevention of serious accidents and an inspection of the Uhřice USF facility itself were carried out. The authorities did not find any serious deficiencies and no measures or sanctions were imposed.
